PRODUCTION UNIT 2

  2 РУ 2.jpg3.jpg

Today, the implementation of advanced technologies allows the current generation to keep up the traditions of our veterans of labour and break records for ore extraction at our company. Technical re-equipment of production is constantly underway, resulting in the commissioning of new hydromechanized systems and other mining equipment at the mines. The surface production facilities are also being developed, where the most efficient and energy-saving equipment is installed.

PROCESSING PLANT OF PU 2 PRODUCES AND SUPPLIES THE FOLLOWING PRODUCTS

  • Potassium chloride standard

  • Potassium chloride granular

  • Potassium chloride fine granular

солемельницы  СОФ 1 розовые гранулы

DIRECTOR OF PU 2

VIKTOR GETMANOV

PERSONAL RECEPTION OF CITIZENS: 

2nd and 4th Wednesday of each month   
Pre-appointment call on a day of reception from 8.30 a.m. till 9.30 a.m.
Tel.: 00 375 174 29 51 82    

HISTORY  

1964 6.jpg

October 1961 – Start of shaft sinking. These works were carried out by A. Selivanov, M. Volkov and M. Yegorov.

14 April 1964 – Miners lifted the first bucket of salt. A month later, the first road header SBM-2 was lowered into the mine.

23 December 1965 – The State Commission signed the Certificate of Acceptance of the first stage of the 2nd Soligorsk Potash Plant. That was the date when the history of the 2nd Production Unit began.

14 February 2003 – Grand opening of the Krasnoslobodsky mine was held.

8 May 2009 – 1st stage of construction of the Krasnoslobodsky mine was commissioned. The President of the Republic of Belarus A. Lukashenko attended the commissioning ceremony.

2011 – Decision was taken to uncover the 4th potash level at the Mine 2 in order to solve the problem of replenishment of mineral resources. In October 2015, the prospecting works were started.